• ¥

    Electrolytic Cobalt

    23.40

  • ¥

    Electrolytic Nickel

    12.10

  • ¥

    Electrolytic Copper

    7.87

2025-05-03

The production line for mineral stones at Excellen Minerals SARL has successfully completed its trial run



On May 3rd, the company's holding enterprise, Excellen Minerals SARL, in the Democratic Republic of the Congo successfully put into operation a stone production line. This production line was built through independent renovation using idle equipment, with a processing capacity of approximately 50-60 tons per hour.

 

 

This stone production line processes the waste rocks extracted from open-pit mining into qualified construction stones. It can not only turn waste into treasure and realize the resource utilization of waste rocks, but also provide high-quality materials for the subsequent PE4881 ore body development project construction, thereby reducing the project construction cost.



图片1.png

(The Chinese and Congolese employees are preparing for the trial run by conducting inspections.)




Writing/Photography: Xi Yaqi